The terms are
listed in alphabetical order. Click on the following links or
scroll down the page.
AMP (agreed maximum price)
Bathroom renewal
Boiler renewal, individual systems
Cavity wall insulation
Central heating renewal – individual
systems
Clerk of works (COW)
Client representative (CR)
Communal boiler renewal
Communal decoration
Communal lighting
Considerate Constructors Scheme
Constructor
Contract period
Decent Homes standard
Defects liability period
Environmental works
Feasibility surveys
Framework agreement
Homes for Islington standard
Kitchen renewal
Lateral mains renewal
Lift refurbishment and/or renewal
Mechanical fan installation
Partnering adviser
Project officer (PO)
Project partnering agreement (PPA)
Project partnering team (PPT)
Project partnering timetable
Quantity surveyor (QS)
Resident liaison officer (RLO)
Rewiring, internal
Roof repair/renewal
Security works
Site compound
Site manager
Snagging
Steering group
Structural repairs
Sustainability budget
Underpinning
Window repair/renewal
AMP (agreed maximum
price)
The price that is agreed after HFI, the constructor and residents
have worked up the detail of the project. The final cost of
the project should not normally exceed this price.
Top
Bathroom
renewal
Where bathrooms in HFI tenanted properties do not comply with
the Decent Homes Standard or are likely to fail before 2010,
new bathroom fittings will be installed. Tenants will be fully
consulted on proposals and choices will be offered. (Not applicable
to leasehold dwellings)
Top
Boiler
renewal, individual systems
Renewal of gas fired central heating boilers where these have
reached the end of their serviceable life. Other components
e.g. radiators and programmers/controls will not be replaced.
(Not applicable to leasehold dwellings)
Top
Cavity
wall insulation
The installation of thermal insulation between the external
and internal leaves of cavity walls. This improves thermal comfort
and reduces fuel bills. Although HFI aims to undertake this
work as part of its commitment to achieving Decent Homes Standard,
it is only possible where the existing building construction
permits.
Top
Central
heating renewal – individual systems
Renewal of complete gas fired central heating systems where
these have reached the end of their serviceable life. All other
components, e.g., radiators and programmers/controls will be
replaced as part of the works. (Not applicable to leasehold
dwellings)
Top
Clerk of
works (COW)
Employed by HFI to ensure that the constructor’s work
is of the required quality. Under the project partnering agreement
it is the constructor’s role to ensure that work is of
the specified quality. The clerk of works typically undertakes
random sample inspections and checks that the Constructor’s
quality control systems are adequate.
Top
Client
representative (CR)
The name given to the architect/surveyor under the project partnering
agreement.
Top
Communal
boiler renewal
Renewal of the boilers that serve communal heating systems.
Top
Communal
decoration
The redecoration of the exterior of the building, common hallways,
staircases and foyers, etc. The renewal of floor coverings is
often included where required.
Top
Communal
lighting
The renewal of communal light fittings, generally with vandal
resistant, low energy fittings. Works may include the introduction
of new lighting points and/or the re-siting of existing fittings
to improve security.
Top
Considerate
Constructors Scheme
The considerate constructors scheme is a voluntary scheme and
aims to present a more positive image of the construction industry.
It does this by constructors committing themselves to higher
standards of site cleanliness, improved site safety, better
site housekeeping and traffic management, a reduction in their
impact in the local community and the wider environment.
Top
Constructor
The name given to a building contractor under the project partnering
agreement (PPA).
Top
Contract
period
The period from inception to completion of the works.
Top
Decent
Homes Standard
Standards of repair and comfort set by central government for
all public sector housing. All public sector housing is required
to meet the standards by the end of December 2010.
Top
Defects
liability period
The period, (generally 12 months from hand over of the works),
during which defective work will be remedied by the constructor.
Top
Environmental
works
Works to the external areas of estates. These may include any
or all of the following subject to budgetary restrictions:
- Landscaping
- Accessibility works
- Paving repairs
- Fencing
- Parking space marking
- Refurbishment or repair of play equipment
The selection and design of environmental work is always the
subject of consultation with residents. Works may be funded
from sustainability budgets.
Top
Feasibility
surveys
These are surveys undertaken on sample properties in order to
make an initial assessment of work requirements. Detailed work
specifications are generally developed once a constructor has
been appointed for the project, in the period leading to the
agreed maximum price (AMP).
Top
Framework
agreement
An agreement between HFI and a number of constructors to work
together in a spirit of partnership for a set period of years.
The selection of the constructors that HFI work with was based
on a combination of their prices and their commitment to the
provision of quality service and work. A panel of residents
and HFI technical staff were involved in the selection process.
The advantages of working in this way are that we build long-term
relationships with constructors who understand our requirements
in relation to quality of service and work. We do not have to
repeat the learning process every time we start a new project.
Top
Homes
for Islington standard
Repair/improvement standards set by HFI. These standards are
over and above those required by the government’s Decent
Homes Standards.
Top
Kitchen
renewal
Where kitchens in HFI tenanted properties do not comply with
the Decent Homes Standard or are likely to fail before 2010,
new fitted kitchens will be installed. Tenants will be fully
consulted on proposals and choices of finish will be offered.
(Not applicable to leasehold dwellings)
Top
Lateral
mains renewal
The re-wiring of the mains supplies to individual dwellings
from the electricity supply company's intake board. The great
majority of the work is done in communal areas, but access is
required to individual dwellings in order to make the final
connection to the distribution panel (fuse board).
Top
Lift refurbishment
and/or renewal
Repairs or renewals to lift engineering and/or renewal or refurbishment
of lift cars.
Top
Mechanical
fan installation
Where windows are being renewed mechanical extractor fans are
generally installed in kitchens and bathrooms to reduce the
risk of condensation. (Optional in leasehold dwellings)
Top
Partnering
adviser
A professional from within the construction industry whose role
is to ensure that all members of the Project Partnering Team
work effectively together. They advise on technical aspects
of the Project Partnering Agreement and help the team to draw
up the Project Partnering Timetable.
Top
Project officer
(PO)
The HFI staff member who formally commissions the work, is responsible
for driving the project forward and who directs the resident
consultation process.
Top
Project partnering
agreement (PPA)
The legal form of contract now used by HFI and its Constructors
to undertake major works.
Top
Project partnering
team (PPT)
The team of professionals who work together to develop and implement
the project. The PPT includes the Project Officer (PO), Client
Representative (CR), Quantity Surveyor (QS), Partnering Advisor
(PA) and the Constructor.
Top
Project
partnering timetable
The programme for the project that sets out the anticipated
dates when the major events are scheduled to take place.
Top
Quantity surveyor
(QS)
The surveyor who is responsible for cost control and valuation
of works. It is normal to have a QS on the Constructor side
and one who works for HFI.
Top
Resident liaison
officer (RLO)
Employed by the constructor to make arrangements with residents
regarding access for the works, etc.
Top
Rewiring,
internal
The re-wiring of ring mains and lighting circuits within individual
flats. (Not applicable to leasehold dwellings)
Top
Roof repair/renewal
Roofs will be subject to detailed inspection. Results of inspections
will determine whether repairs or complete renewals are required.
As it is essential that all HFI properties meet the Decent Homes
Standard by 2010, decisions on action to be taken will take
account of likely deterioration up to that date. Roof coverings
will generally match existing except in the case of flat roofs
where upgraded specifications may be applied.
Top
Security
works
The installation of measures to improve resident security.
These may include any or all of the following subject to budgetary
restrictions:
- CCTV installation
- Concierge works
- Improved communal lighting
- Automatic door control systems
- Re-design of landscaping to improve lines of sight
The selection and design of security work is always the subject
of consultation with residents. Works may be funded from sustainability
budgets.
Top
Site
compound
The secure area where the constructor’s offices and/or
materials storage area for the works are located.
Top
Site
manager
Employed by the constructor responsible for:
- Management of work on site.
- Responsibility for the subcontractors and sequencing of
works.
- Responsibility for checking the standard of workmanship
prior to inspection by the clerk of works
Top
Snagging
An inspection of works that are virtually complete in order
to prepare a list (snagging list) of works that need to be completed
before the work is certified as complete.
Top
Steering
group
A regular meeting that provides residents with the opportunity
to ‘have their say’ about scope and delivery of
works etc. Steering group membership includes:
- Tenant management organisation representative (on TMO managed
estates)
- Tenant and resident association representative (if there
is a recognised TRA - tenant and resident association)
- Other resident representatives
- Project officer
- Client representative
- Constructor (usually site agent and liaison officer)
Top
Structural
repairs
These may include repairs to spalling concrete (where concrete
has lost it’s adhesion and is falling away from the surface
of the structure), repairs to brickwork including re-pointing
the cement mortar joints and cutting out and renewing any badly
damaged bricks.
Top
Sustainability
budget
A budget that is used to supplement the budget for each Decent
Homes scheme. It is used to pay for works that would normally
be outside the scope of Decent Homes works, but which residents
feel would materially enhance the scheme and contribute to the
useful life of the major works.
The choice and design of sustainability work is always the
subject of consultation with residents.
Top
Underpinning
Repairs to foundations (usually where these have been affected
by subsidence)
Top
Window
repair/renewal
Windows will be subject to detailed inspection. Results of inspections
will determine whether repairs or complete renewals are required.
As it is essential that all HFI properties meet the Decent Homes
Standard by 2010, decisions on action to be taken will take
account of likely deterioration up to that date. Where replacement
is required, replacement windows will generally be double-glazed.
The type of windows and material they are made from will be
the subject of consultation with residents and Islington Planners.
Top
|